Abstract
In this paper we demonstrate how kanbans can be used in a disassembly line setting. Disassembly line is quite different from assembly line in terms of material movement, demand arrival and inventory level fluctuation. We discuss these differences and introduce the concept of a multi-kanban mechanism to cope with them. With the help of a simulation model (developed using the ARENA software), we show that the modified kanban mechanism is in fact an effective tool for a disassembly line setting. An example is presented to illustrate the concept.
Keywords
End of life products, Kaban system, Disassembly
Subject Categories
Recycling (Waste (etc.))
Disciplines
Engineering
Publisher
Omnipress
Publication Date
2003
Rights Information
Copyright 2003, Surendra M. Gupta
Rights Holder
Gupta M. Surendra
Permanent URL
Recommended Citation
Gupta, Surendra M.; Udomsawat, Gun; and Kamarthi, Sagar V., "A multi-kanban model for disassembly" (2003). . Paper 9. http://hdl.handle.net/2047/d10013817
Click button above to open, or right-click to save.

Notes
Originally published in the Proceedings of the 2003 Northeast Decision Sciences Institute Conference, Providence, Rhode Island, pp. 169-171, March 27-29, 2003