Abstract

In this paper we demonstrate how kanbans can be used in a disassembly line setting. Disassembly line is quite different from assembly line in terms of material movement, demand arrival and inventory level fluctuation. We discuss these differences and introduce the concept of a multi-kanban mechanism to cope with them. With the help of a simulation model (developed using the ARENA software), we show that the modified kanban mechanism is in fact an effective tool for a disassembly line setting. An example is presented to illustrate the concept.

Notes

Originally published in the Proceedings of the 2003 Northeast Decision Sciences Institute Conference, Providence, Rhode Island, pp. 169-171, March 27-29, 2003

Keywords

End of life products, Kaban system, Disassembly

Subject Categories

Recycling (Waste (etc.))

Disciplines

Engineering

Publisher

Omnipress

Publication Date

2003

Rights Information

Copyright 2003, Surendra M. Gupta

Rights Holder

Gupta M. Surendra



Click button above to open, or right-click to save.

Included in

Engineering Commons

Share

COinS