Abstract
We present a new Kanban system specifically developed for material control and scheduling in a disassembly environment. We briefly highlight the differences between the new (modified) and the traditional Kanban system. We assert that in the disassembly environment, the Kanban system is superior to the push system currently practiced in industry. To that end, we consider a case example and test its performance by experimenting with several different scenarios. In all instances, the Kanban system outperforms the push system.
Keywords
Kanban system, Disassembly
Subject Categories
Recycling (Waste (etc.))
Disciplines
Engineering
Publisher
Omnipress
Publication Date
2000
Rights Information
Copyright 2000, Surendra M. Gupta
Rights Holder
Gupta M. Surendra
Permanent URL
Recommended Citation
Gupta, Surendra M. and Kizilkaya, Elif A., "A modified kanban system for disassembly" (2000). . Paper 7. http://hdl.handle.net/2047/d1001374x
Click button above to open, or right-click to save.

Notes
Originally published in the Proceedings of the 2000 Annual Meeting of the Northeast Decision Sciences Institute, Atlantic City, New Jersey, March 22-24, pp. 239-241, 2000