Abstract

In this paper, we apply the Dynamic Kanban System for Disassembly Line (DKSDL) to an industrial setting. The product considered is a second-generation industrial voice recognition client unit. The company manufacturing this device has moved on to the next generation device, which has more memory, faster CPU and a standardized OS support. There are many of the older generation clients in the customer base, which are being upgraded to the new generation resulting in a large number of the older units at hand. These units are being returned to the manufacturing facility to be processed. The casing and some other components are being used in the new design and can be disassembled and stocked as refurbished items to be used in returned products processing. The resulting DKSDL for this disassembly process is modeled using simulation and the results are discussed.

Notes

Originally published in the Proceedings of the SPIE International Conference on Environmentally Conscious Manufacturing VI, Boston, Massachusetts, pp.22-29, October 1-3, 2006

Keywords

disassembly process, voice recognition client unit, Dynamic Kanban System for Disassembly Line (DKSDL)

Subject Categories

Production engineering

Disciplines

Engineering

Publisher

SPIE

Publication Date

2006

Rights Information

Copyright 2006, Society of Photo-Optical Instrumentation Engineers

Restrictions

This paper was published in Proceedings of SPIE (Volume 6385) and is made available as an electronic reprint with permission of SPIE. One print or electronic copy may be made for personal use only. Systematic or multiple reproduction, distribution to multiple locations via electronic or other means, duplication of any material in this paper for a fee or for commercial purposes, or modification of the content of the paper are prohibited.

Rights Holder

Society of Photo-Optical Instrumentation Engineers



Click button above to open, or right-click to save.

Included in

Engineering Commons

Share

COinS