Abstract
This paper addresses the increasingly prevalent phenomenon of customer integrated production systems. In particular, it examines the operation of systems where customer integration has been enabled by the implementation of EDI and where supply chain uncertainty exists. A simulation model of such a system was employed to analyze four different production systems operating under different batch procedures and cost scenarios. Numerous experiments were conducted and the results obtained were analyzed. Several conclusions relating to customer behavior pattern and supply chain uncertainty were drawn from this analysis.
Keywords
Electronic data interchange (EDI), Supply chain management
Subject Categories
Production engineering
Disciplines
Engineering
Publisher
Omnipress
Publication Date
1994
Rights Information
Copyright 1994, Surendra M. Gupta
Rights Holder
Gupta M. Surendra
Permanent URL
Recommended Citation
Gupta, Surendra M. and Brennan, Louis, "Customer integrated production system analysis" (1994). . Paper 33. http://hdl.handle.net/2047/d10013957
Click button above to open, or right-click to save.

Notes
Originally published in the Proceedings of the 1994 Northeast Decision Sciences Institute Conference, pp. 242-244, 1994